Around 10 a.m. on Wednesday, a yellow-vested crew from the street division of Bloomington’s department of public works started drilling holes to reinstall stop signs for 7th Street traffic at Dunn Street.
The work was finished by around 3 p.m. That makes the intersection at Dunn and 7th, just west of the Indiana University campus, an all-way stop.
The stop sign went in, because city engineer Andrew Cibor used his legal authority, to order the placement of the stop signs for 180 days.
Cibor’s order is based on a study of crashes along the 7th Street corridor, before and after the 7-Line separated bicycle lane was installed in 2021. The study showed an increase in crash numbers, especially at the intersection of Dunn and 7th Street. Continue reading “Stop signs reinstalled at 7th & Dunn in Bloomington”